Setting things up
I like trains

Stockton Light Rail

Map is Public
created 41 weeks ago
updated 19 weeks ago
This LRT line could be built in 3 phases to reduce construction costs. The first phase would run in between the Airport and Hammer Lane stations. The second phase would extend the line north to Downtown Lodi. The third phase would extend the line south to Promenade Shopping Center
Branch History
  1. MetroDreamin' by I like trains
  2. Built from scratch

Comments

Score
0
Ridership
32.1M
Cost
$ 1.92B
Stations
30
Lines
1
Modes
1
Length
48 km
Where do these numbers come from?
Stockton Light Rail by
created at
updated at 2025-02-09T20:48:14.876Z
This LRT line could be built in 3 phases to reduce construction costs. The first phase would run in between the Airport and Hammer Lane stations. The second phase would extend the line north to Downtown Lodi. The third phase would extend the line south to Promenade Shopping Center
Map type: local | Total track length: 30 miles | Center coordinate: 37.9539, -121.275 | * LRT: (Light rail/interurban, 30 stations) Downtown Lodi (transfer to ACE), Vine Street, Kettleman, Century, Micke Grove, Morada, West Lane, Hammer Triangle, Humphreys College, Swain, San Joaquin Delta College, University of the Pacific, Regent, Rose Street, Ballpark/Arena, Downtown Transit Center, Robert J. Cabral Station (transfer to ACE), Hazelton, Fairgrounds, 10th Street, Ralph, Boeing Way, Airport, Lathrop, Northgate, Louise, Union, Downtown Manteca, Industrial Park, Promenade Shopping Center
stockton, light, rail, san, joaquin, county, california, us, ca, united, states, map maker, metro map maker, subway map maker, transit map maker, rail map maker, bus map maker, map creator, metro map creator, subway map creator, transit map creator, rail map creator, bus map creator, dream map, fantasy map, fantasy metro, fantasy subway, map sketch, map tool, transit tool, public transportation map