Setting things up
That one person from Chicago (topfc)

Chicagoland Transit Conglomerate (CTC)

Map is Public
created 81 weeks ago
updated 9 hours ago
This is fictional; the real thing doesn't look like this at all. Want to add a suggestion? Comment down. If you want to request a full system, the qualifications should* be: 1. It needs to have at least one transfer to any regional rail and/or regional Bus Shuttle 2. Has a reasonable population size (≥55k pop. [exceptions are possible]) 3. Have a visual distance between the new station and a pre-existing one unless it makes sense to have proximity (exceptions may be applied) 4. Shouldn't overlap with any other system except for regional rail/bus shuttle, and/or be exempt by the map's owner. Future Plans (chronologically per system): CUTC: • 34 Reroute to Adler • 49 Halsted Route 121st/Halsted-Irving Park/Lake Shore • 50a/b Pulaski Routes 111th/Pulaski-Cicero Loop-Crawford/Central • 26a/b realign to Central Avenue • 51a/b Ridgeland-Narragansett Routes Morton College-Milwaukee/Dempster • 41b Western Route 63rd/Damen- 127th Union Terminal • 52 87th Route Chicago Ridge Mall-96th/Ewing • 53 Evanston Connector (Church/Golf) Howard Station-Holocaust Museum
Branch History
  1. MetroDreamin' by That one person from Chicago (topfc)
  2. Built from scratch

Comments

Score
0
Ridership
2.23B
Cost
$ 344B
Stations
5,509
Lines
277
Modes
8
Length
6,578 km
Where do these numbers come from?
Chicagoland Transit Conglomerate (CTC) by
created at
updated at 2025-08-04T20:22:12.049Z
This is fictional; the real thing doesn't look like this at all. Want to add a suggestion? Comment down. If you want to request a full system, the qualifications should* be: 1. It needs to have at least one transfer to any regional rail and/or regional Bus Shuttle 2. Has a reasonable population size (≥55k pop. [exceptions are possible]) 3. Have a visual distance between the new station and a pre-existing one unless it makes sense to have proximity (exceptions may be applied) 4. Shouldn't overlap with any other system except for regional rail/bus shuttle, and/or be exempt by the map's owner. Future Plans (chronologically per system): CUTC: • 34 Reroute to Adler • 49 Halsted Route 121st/Halsted-Irving Park/Lake Shore • 50a/b Pulaski Routes 111th/Pulaski-Cicero Loop-Crawford/Central • 26a/b realign to Central Avenue • 51a/b Ridgeland-Narragansett Routes Morton College-Milwaukee/Dempster • 41b Western Route 63rd/Damen- 127th Union Terminal • 52 87th Route Chicago Ridge Mall-96th/Ewing • 53 Evanston Connector (Church/Golf) Howard Station-Holocaust Museum
Map type: local | Total track length: 4087 miles | Center coordinate: 42.0239, -87.8533 |
chicagoland, transit, conglomerate, ctc, illinois, us, il, united, states, map maker, metro map maker, subway map maker, transit map maker, rail map maker, bus map maker, map creator, metro map creator, subway map creator, transit map creator, rail map creator, bus map creator, dream map, fantasy map, fantasy metro, fantasy subway, map sketch, map tool, transit tool, public transportation map